Sunday 7 August 2011

Motor part II

Fitted new shells to the rods and fitted them to the crank. Warmed up the drive-side inner roller bearing and slipped it onto the crank. Propped up the left-hand case and dropped the crank assembly into place. It hung up with 1/4" to go, so I ran a blowlamp over the case, allowing it and the outer main bearing race to ease just a fraction until the crank slid down the last little bit. Added some anaerobic instant gasket and bolted down the right-hand case.


No comments:

Post a Comment