From Triumph 650 rebuild |
Sunday, 23 October 2011
In!
Grabbed the motor with both hands and heaved it over to the frame, which was strapped down to my makeshift bike stand. Slotted it into place without too much difficulty and slipped some mounting bolts into place. I don't know how long the engine and frame have been apart, but it certainly seemed pleased to be back in its rightful place.
Monday, 17 October 2011
Head, Part II
Checked the height of the pushrod tubes with the head placed on the cylinders, and worked out the correct thickness of translucent seals (bottom) and o-ring (top) to seat properly. With these seals in place the head was between 1-1.5mm off the gasket, and this closed up nicely when the head bolts were tightened.
From Triumph 650 rebuild |
From Triumph 650 rebuild |
Hubs
Picked up the hubs from the powder coaters. What a difference! Fitted new wheel bearings so all I need to do now is teach myself wheelbuilding....
From Triumph 650 rebuild |
Wednesday, 5 October 2011
Subscribe to:
Posts (Atom)